Answered on August 11,2020
Registration process not yet completed. The field survey will commence within two months.
KSFE
Sponsored
เดเต.เดเดธเต.เดเดซเต.เด เดญเดตเดจ เดตเดพเดฏเตเดช
30 เดตเตผเดทเด เดตเดฐเตเดฏเตเดณเตเดณ เดคเดฟเดฐเดฟเดเตเดเดเดตเต เดเดพเดฒเดพเดตเดงเดฟเดฏเดฟเดฒเตโ.. เดฒเดณเดฟเดคเดฎเดพเดฏ เดจเดเดชเดเดฟเดเตเดฐเดฎเดเตเดเดณเดฟเดฒเตเดเต เดจเตเดเดพเด 1 เดเตเดเดฟ เดฐเตเดช เดตเดฐเต เดตเดพเดฏเตเดช...T&C Apply
30 เดตเตผเดทเด เดตเดฐเตเดฏเตเดณเตเดณ เดคเดฟเดฐเดฟเดเตเดเดเดตเต เดเดพเดฒเดพเดตเดงเดฟเดฏเดฟเดฒเตโ.. เดฒเดณเดฟเดคเดฎเดพเดฏ เดจเดเดชเดเดฟเดเตเดฐเดฎเดเตเดเดณเดฟเดฒเตเดเต เดจเตเดเดพเด 1 เดเตเดเดฟ เดฐเตเดช เดตเดฐเต เดตเดพเดฏเตเดช...T&C Apply
Related Questions
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020What is the minimum space required to install a solar rooftop project as part of the KSEB Soura scheme?
For installing a minimum solar plant capacity of 2 kWp, 200 sq.ft. is required.
1 36 676 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020If my house needs to be renovated, will KSEB replace the Soura solar panel free of cost?
You have to pay the labour charge for replacing the Soura solar panel.
1 12 199 -
KSFE
Sponsoredเดเต.เดเดธเตโ.เดเดซเต.เด เดจเตเดเตเดเด เดจเดฟเดเตเดทเตเดช เดชเดฆเตเดงเดคเดฟ
เดเต.เดเดธเตโ.เดเดซเต.เด เดฏเดฟเดฒเต เดจเดฟเดเตเดทเตเดชเดเตเดเตพเดเตเดเต เดเดจเดฟ เดเตเดเตเดคเตฝ เดจเตเดเตเดเด!
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Suppose I have set up a plant with a 40% subsidy scheme with 3 kWp capacity as part of the KSEB Soura scheme. If I have excess electricity after my consumption, can this be adjusted against my bill via net metering?
In model 2, every year amount will be adjusted on September 30. If there is an export of electricity, ...
1 82 1596 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020What will be the cost of Solar power plant with 3 kW capacity, if applied on a 40% scheme as part of the KSEB Soura scheme?
It will cost you Rs 1,62,000. If you opt for Model 2, you get 40% of it as the subsidy.So you need to pay ...
1 88 1416 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020For 3KW plant, how much is the cost in KSEB Soura scheme?
As per the Ministry of New and Renewable Energy (MNRE) issued guidelines, the maximum amount the empanelled service providers ...
1 40 758 -
KSFE
Sponsoredเดเต.เดเดธเตโ.เดเดซเต.เด เดจเตเดเตเดเด เดชเตเดฒเดธเต เดจเดฟเดเตเดทเตเดช เดชเดฆเตเดงเดคเดฟ
เดเต.เดเดธเตโ.เดเดซเต.เด เดฏเดฟเดฒเต เดจเดฟเดเตเดทเตเดชเดเตเดเตพเดเตเดเต เดเดจเดฟ เดเตเดเตเดคเตฝ เดจเตเดเตเดเด!
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020I have applied for the KSEB Soura scheme Phase 1 earlier. Officers from KSEB inspected my rooftop.I have not got any reply from them since then. What to do?
Call 1912 with your consumer number and inform them about your issue.
1 22 385 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 22,2020How much area wanted for 3 kW solar plant as part of the KSEB Soura scheme?
300 sqft is required for a 3 kW Solar plant.
1 5 52 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 22,2020Can't remember the KSEB Soura model I have applied for? Is there any way to find it?
There is a flexibility to change the plan before signing the agreement for KSEB Soura scheme.
1 5 43 -
KSFE
SponsoredKSFE เดเดพเดฒเดเตเดธเดฟ เดเดฟเดเตเดเดฟเดเตพ
เดธเตเดธเตเดฅเดฟเดฐเดฎเดพเดฏ เดธเดฎเตเดชเดพเดฆเตเดฏเด, เดตเดพเดจเตเดณเดฎเตเดฏเดฐเตเดจเตเดจ เดธเดฎเตเดฆเตเดงเดฟ!!! 2024 April 1 เดฎเตเดคเดฒเตโ 2025 February 28 เดตเดฐเต
-
Kerala State Electricity Board
Government of Kerala . Answered on March 26,2020I have applied for KSEB Soura 5 kW plant. Can I change to 10 kW plant in Phase 2?
You can change from 5 KW to 10 KW at the time of site inspection or any time before ...
1 15 223 -
Kerala State Electricity Board
Government of Kerala . Answered on July 08,2020Does the KSEB Soura project have any meter or any device to know the consumption, produced electricity, electricity taken by KSEB etc. ?
There will be net meter connected at the premises of the consumer.
1 5 285 -
Kerala State Electricity Board
Government of Kerala . Answered on August 24,2020I wish to register for KSEB Soura scheme. But I cannot get the registration form online. Why?
Link for registering in Soura Scheme: KSEB Soura Scheme Link The consumer has to register with his User name and ...
3 0 168 -
Kerala State Electricity Board
Government of Kerala . Answered on September 09,2020I have applied for KSEB Soura Scheme through web portal. Now it shows "processed" against my consumer number. How do I know the status of the application. What are the next steps to be taken by me?
Next step is site inspection. That will happen in next two months. Currently, you cannot check the status of ...
1 0 2386 -
Kerala State Electricity Board
Government of Kerala . Answered on October 14,2020I have applied for KSEB Soura model 2 subsidy. Will the solar plant/residential be installed by KSEB Kerala or can I ask Tata solar to do it for me and get 40% subsidy ?
You will get subsidy from KSEB provided you choose any of the empanelled service providers of KSEB.
1 41 1003 -
Try to help us answer..
-
I'm planning to upgrade my ongrid rooftop solar from 3 kw to 5 kw as part of KSEB Soura scheme. Will I have to buy a new 5 kw dc ac inverter. Or Can I buy a new 2 kw inverter and install this inverter additionally Or Will I need to buy a new 5kw inverter
Write Answer
-
I have installed KSEB solar power plant in my house. Suppose the plant made 400 units and I have used 500 units a month. So should I pay the electricity bill for 100 units or will it be adjusted from the previous month's excess unit reserve?
Write Answer
-
How much time it would take in Kerala for getting metre changed by KSEB for on grid Solar connection after submitting papers after installation?
Write Answer
-
Kerala State Electricity Board-Soura (Solar project)-Subsidy scheme 1C with an agreement that excess unit produced from the rooftop would be taken by KSEB through on-grid system and will be paid back. But more than an year passed no payment received. What to do?
Write Answer
-
Can one convert an KSEB Soura on-grid system to offgrid at a later date?
Write Answer
-
I'm planning to upgrade my ongrid rooftop solar from 3 kw to 5 kw as part of KSEB Soura scheme. Will I have to buy a new 5 kw dc ac inverter. Or Can I buy a new 2 kw inverter and install this inverter additionally Or Will I need to buy a new 5kw inverter
-
Trending Questions
-
JOY MRC
Answered on September 19,2021How to convert license number 5/9308/2014 from Kerala to this new format in Digilocker?
Use mparivahan app for RC and License addition which is equivalent to digilocker and also valid for Rto checking. ...
2 2849 59554 -
Niyas Maskan
Village Officer, Kerala . Answered on January 26,2021How to get the affidavit for caste certificate in Kerala ?
เดเดฐเต เดตเตเดณเตเดณ เดชเตเดชเตเดชเดฑเดฟเตฝ เดฎเตเดเดณเดฟเตฝ เด เดซเดฟเดกเดตเดฟเดฑเตเดฑเต เดเดจเตเดจเต เดฐเตเดเดชเตเดชเตเดเตเดคเตเดคเตเด เด เดคเดฟเดจเต เดคเดพเดดเต เดเตผเดเตเดเดพเดฃเต เด เดคเต เดธเดฎเตผเดชเดฟเดเตเดจเดคเต เด เดคเต เดฐเตเดเดชเตเดชเตเดเตเดคเตเดคเตเด. เด เดคเดฟเดจเต เดถเตเดทเด เดเดฐเดพเดฃเต เดธเดฎเตผเดชเดฟเดเตเดจเดคเต เด เดตเดฐเตเดเต เดตเดฟเดตเดฐเด เดจเตฝเดเตเด. เด เดคเดฟเดจเต ...
1 379 19537 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 14,2023Where are the AI Camera locations of motor vehicle department in Kerala?
*All Kerala MVD AI camera locations* Thiruvananthapuram Parassala Thiruvananthapuram Pambukala Thiruvananthapuram Kovalam Jn Thiruvananthapuram Neyyattinkara_2 Thiruvananthapuram Neyyattinkara_1 Thiruvananthapuram Thozhukkal Thiruvananthapuram Balaramapuram_1 Thiruvananthapuram Balaramapuram_2 Thiruvananthapuram Pallichal Jn Thiruvananthapuram Thiruvallom Thiruvananthapuram Kumarichantha Thiruvananthapuram ...
1 0 79263 -
Niyas Maskan
Village Officer, Kerala . Answered on August 31,2023What is the format affidavit for non creamy layer certificate in Kerala?
เด เดซเดฟเดกเดตเดฟเดฑเตเดฑเต เดเดจเตเดจ เดตเดฟเดฒเตเดฒเดเต เดเดซเตเดธเตผ เดฎเตเตปเดชเดพเดเต เดเดจเตเดจ เดตเดฟเดฒเตเดฒเตเดเดฟเตฝ เดเดจเตเดจ เดตเดพเตผเดกเดฟเตฝ เดเดจเตเดจ เดตเตเดเตเดเดฟเตฝ เดคเดพเดฎเดธเดฟเดเตเดเตเดจเตเดจ เดเดจเตเดจเดฏเดพเดณเตเดเต เดฎเดเตป เดเดฏ เดเดพเตป เดฌเตเดงเดฟเดชเตเดชเดฟเดเตเดเตเดจเตเดจ เดธเดคเตเดฏเดตเดพเดเตเดฎเตเดฒเด เดเดพเตป เดฎเตเตฝเดเดพเดฃเตเดจเตเดจ เด เดกเตเดฐเดธเดฟเตฝ เดเดคเตเดฐ ...
1 173 3560 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on March 07,2023How can I convert nilam to purayidom in Kerala?
Nilam - purayidom Land conversion or Tharam mattom in Kerala The register containing details of all types of land ( ...
1 327 6933 -
Subhash Chandran
Retired Dy Tahsildar and Land Consultant, Mobile- 8848753166 . Answered on September 07,2023เดธเตเดฅเดฟเดฐเดชเตเดเตเด เดเดจเตเดจเดพเตฝ เดเดจเตเดคเดพเดฃเต?
Settlement เดเดพเดฒเดคเตเดคเต เดฎเดฒเดฌเดพเตผ เดชเตเดฐเดฆเตเดถเดคเตเดคเตเดณเตเดณ เดญเตเดฎเดฟเดเดณเต เดจเดเตเด, เดคเตเดชเต, เดธเตเดฅเดฟเดฐเด เดชเตเดเตเด,เด เดธเตเดฅเดฟเดฐเดค เดชเตเดเตเด, เดจเดฟเดเตเดคเดฟเดเตเดเตเดเดพเดคเดคเต, เดชเตเดฑเดฎเตเดชเตเดเตเดเต เดเดจเตเดจเดฟเดเตเดเดจเต เดเดฑเดพเดฏเดฟ เดคเดฟเดฐเดฟเดเตเดเดฟเดฐเตเดจเตเดจเต…เดธเตเดฅเดฟเดฐเดชเตเดเตเด เดเดจเตเดจเดพเตฝ เดเดฒเตเดฒเดพ เดตเตผเดทเดตเตเด เดธเตเดฅเดฟเดฐเดฎเดพเดฏเดฟ ...
1 0 2523 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 06,2021เดตเตเดเดฟเดจเต เดจเดฎเตเดชเตผ เดเดเตเดเต เดเดฟเดเตเดเตเดตเดพเตป เดเดจเตเดคเต เดเตเดฏเตเดฏเดฃเด ?
เดชเตเดฒเดพเตป เดตเดฐเดเตเดเต เดคเดจเตเดจ engineer เดเดเดชเตเดฒเตเดทเตป certificate เดจเตเดณเตเดณ drawing เดตเดฐเดชเตเดชเดฟเดเตเดเตเด. เดชเตเดณเตเดณเดฟ เดเดฐเต 1000เดฐเตเดช fees เดเดฃเตเดเต เดเดจเตเดจเต เดชเดฑเดฏเตเด เด เดคเต เดเตเดเตเดคเตเดคเต เด เดฏเดพเดณเตเดเต ...
2 201 8027 -
Balachandran Kollam
Answered on August 19,2023เดเดจเตเดคเดพเดฃเต Posession, non LA and non RR?
A certificate of possession is a certificate that certifies who possesses the registered lands. Revenue authorities are also granting ...
1 0 494 -
Niyas Maskan
Village Officer, Kerala . Answered on August 22,2023เดเดฑเดฟเดเดฟเดจเตฝ เดเดงเดพเดฐเด เดจเดทเตเดเดชเตเดชเตเดเตเดเดพเตฝ เดเดจเตเดคเต เดเตเดฏเตเดฏเดฃเด ?
เดเดฑเดฟเดเดฟเดจเตฝ เดเดงเดพเดฐเด เดจเดทเตเดเดชเตเดชเตเดเตเดเต เดเดดเดฟเดเตเดเดพเตฝ เดเดงเดพเดฐเดคเตเดคเดฟเดจเตเดฑเต เดจเดฎเตเดชเดฐเตเด เดเดงเดพเดฐเด เดจเดเดจเตเดจ เดคเตเดฏเดคเดฟเดฏเตเด เดตเตเดเตเดเตเดเตเดฃเตเดเต เดธเดฌเต เดฑเตเดเดฟเดธเตเดเตเดฐเตผ เดเดซเตเดธเดฟเตฝ เดจเดฟเดถเตเดเดฟเดค เดซเตเดธเต เด เดเดเตเดเต เดเตเดฃเตเดเต เด เดชเตเดเตเดทเดฟเดเตเดเดพเตฝ เดเดคเต ...
2 0 975 -
Consumer Complaints & Protection
Regd. Organization for Consumer Rights . Answered on June 25,2021NPS,NPNS, NPI, PHH,AAY เดเดจเตเดคเดพเดฃเต?
NPS - Non Priority Subsidy,NPNS - Non Priority Non Subsidy,NPI - Non Priority Institution,PHH - Priority House Hold,AAY - ...
2 0 16687