Does the KSEB Soura project have any meter or any device to know the consumption, produced electricity, electricity taken by KSEB etc. ?
Does the KSEB Soura project have any meter or any device to know the consumption, produced electricity, electricity taken by KSEB etc. ?
Kerala State Electricity Board, Government of Kerala
Answered on July 08,2020
Answered on July 08,2020
There will be net meter connected at the premises of the consumer.
Guide
  Click here to get a detailed guide
Kerala Voter List 2024 - Search By Name, Download
Empowering citizens to exercise their democratic rights is crucial, especially in the vibrant state of Kerala. This concise guide offers clear steps for downloading the voter list, searchin..  Click here to get a detailed guide
KSFE
Sponsored
เดเต.เดเดธเต.เดเดซเต.เด เดญเดตเดจ เดตเดพเดฏเตเดช
30 เดตเตผเดทเด เดตเดฐเตเดฏเตเดณเตเดณ เดคเดฟเดฐเดฟเดเตเดเดเดตเต เดเดพเดฒเดพเดตเดงเดฟเดฏเดฟเดฒเตโ.. เดฒเดณเดฟเดคเดฎเดพเดฏ เดจเดเดชเดเดฟเดเตเดฐเดฎเดเตเดเดณเดฟเดฒเตเดเต เดจเตเดเดพเด 1 เดเตเดเดฟ เดฐเตเดช เดตเดฐเต เดตเดพเดฏเตเดช...T&C Apply
30 เดตเตผเดทเด เดตเดฐเตเดฏเตเดณเตเดณ เดคเดฟเดฐเดฟเดเตเดเดเดตเต เดเดพเดฒเดพเดตเดงเดฟเดฏเดฟเดฒเตโ.. เดฒเดณเดฟเดคเดฎเดพเดฏ เดจเดเดชเดเดฟเดเตเดฐเดฎเดเตเดเดณเดฟเดฒเตเดเต เดจเตเดเดพเด 1 เดเตเดเดฟ เดฐเตเดช เดตเดฐเต เดตเดพเดฏเตเดช...T&C Apply
Related Questions
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020What is the minimum space required to install a solar rooftop project as part of the KSEB Soura scheme?
For installing a minimum solar plant capacity of 2 kWp, 200 sq.ft. is required.
1 36 676 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Can the solar panel be installed in the house where the tress work is done as part of the KSEB Soura scheme?
It can be done in Model 2,at the customer's expense,with 40% subsidy. Model II of KSEB SOURA Subsidy scheme Consumer owns ...
1 55 1046 -
KSFE
Sponsoredเดเต.เดเดธเตโ.เดเดซเต.เด เดจเตเดเตเดเด เดจเดฟเดเตเดทเตเดช เดชเดฆเตเดงเดคเดฟ
เดเต.เดเดธเตโ.เดเดซเต.เด เดฏเดฟเดฒเต เดจเดฟเดเตเดทเตเดชเดเตเดเตพเดเตเดเต เดเดจเดฟ เดเตเดเตเดคเตฝ เดจเตเดเตเดเด!
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Suppose I have set up a plant with a 40% subsidy scheme with 3 kWp capacity as part of the KSEB Soura scheme. If I have excess electricity after my consumption, can this be adjusted against my bill via net metering?
In model 2, every year amount will be adjusted on September 30. If there is an export of electricity, ...
1 82 1595 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020In the KSEB Soura scheme, does the electricity generated is taken to the grid or do we need to have battery to store the power?
In Off-Grid, you have the need for a battery. But KSEB's projects are On-Grid and in it, there is no ...
1 42 781 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Is the amount paid for the KSEB Soura scheme refundable?
The amount paid for KSEB Soura scheme is refundable, provided that KSEB find it technically not feasible to set up ...
1 39 732 -
KSFE
Sponsoredเดเต.เดเดธเตโ.เดเดซเต.เด เดจเตเดเตเดเด เดชเตเดฒเดธเต เดจเดฟเดเตเดทเตเดช เดชเดฆเตเดงเดคเดฟ
เดเต.เดเดธเตโ.เดเดซเต.เด เดฏเดฟเดฒเต เดจเดฟเดเตเดทเตเดชเดเตเดเตพเดเตเดเต เดเดจเดฟ เดเตเดเตเดคเตฝ เดจเตเดเตเดเด!
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Who will do the maintenance for the KSEB Soura scheme?
KSEB will do the maintenance through an empanelled service provider. KSEB will provide a list of empanelled service providers. ...
1 19 368 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Should I apply for Model 1 or 2 of KSEB Soura Scheme?
You can register for any of the models now. After inspection, based on technical feasibility, you have the option ...
1 22 436 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020How much will be the cost for 2 kWp installation for KSEB Soura scheme?
As per the Ministry of New and Renewable Energy (MNRE) issued guidelines, the maximum amount the empanelled service providers ...
1 29 599 -
KSFE
SponsoredKSFE เดเดพเดฒเดเตเดธเดฟ เดเดฟเดเตเดเดฟเดเตพ
เดธเตเดธเตเดฅเดฟเดฐเดฎเดพเดฏ เดธเดฎเตเดชเดพเดฆเตเดฏเด, เดตเดพเดจเตเดณเดฎเตเดฏเดฐเตเดจเตเดจ เดธเดฎเตเดฆเตเดงเดฟ!!! 2024 April 1 เดฎเตเดคเดฒเตโ 2025 February 28 เดตเดฐเต
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Will KSEB provides money to excess electricity in Model 2 of Soura scheme?
Yes, KSEB will provide money to excess electricity in Model 2 by the month of September every year.
1 12 194 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020For 3KW plant, how much is the cost in KSEB Soura scheme?
As per the Ministry of New and Renewable Energy (MNRE) issued guidelines, the maximum amount the empanelled service providers ...
1 40 758 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Can I apply for KSEB Soura Scheme when the construction of my house is going on?
If you are planning to finish construction in 6 months' time, you can apply for it. If it is ...
1 9 131 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Can I change the model, even if I have registered for KSEB Soura Scheme?
You can change the model. While inspection, if it is technically not feasible to be done by one model, ...
1 7 98 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020When is the last day to apply for KSEB Soura scheme Phase 2?
Only the first 75000 of the consumers who have registered for the model is eligble for the KSEB Soura scheme ...
1 26 506 -
Try to help us answer..
-
I'm planning to upgrade my ongrid rooftop solar from 3 kw to 5 kw as part of KSEB Soura scheme. Will I have to buy a new 5 kw dc ac inverter. Or Can I buy a new 2 kw inverter and install this inverter additionally Or Will I need to buy a new 5kw inverter
Write Answer
-
I have installed KSEB solar power plant in my house. Suppose the plant made 400 units and I have used 500 units a month. So should I pay the electricity bill for 100 units or will it be adjusted from the previous month's excess unit reserve?
Write Answer
-
How much time it would take in Kerala for getting metre changed by KSEB for on grid Solar connection after submitting papers after installation?
Write Answer
-
Kerala State Electricity Board-Soura (Solar project)-Subsidy scheme 1C with an agreement that excess unit produced from the rooftop would be taken by KSEB through on-grid system and will be paid back. But more than an year passed no payment received. What to do?
Write Answer
-
Can one convert an KSEB Soura on-grid system to offgrid at a later date?
Write Answer
-
I'm planning to upgrade my ongrid rooftop solar from 3 kw to 5 kw as part of KSEB Soura scheme. Will I have to buy a new 5 kw dc ac inverter. Or Can I buy a new 2 kw inverter and install this inverter additionally Or Will I need to buy a new 5kw inverter
-
Trending Questions
-
JOY MRC
Answered on September 19,2021How to convert license number 5/9308/2014 from Kerala to this new format in Digilocker?
Use mparivahan app for RC and License addition which is equivalent to digilocker and also valid for Rto checking. ...
2 2842 59408 -
Niyas Maskan
Village Officer, Kerala . Answered on August 31,2023What is the format affidavit for non creamy layer certificate in Kerala?
เด เดซเดฟเดกเดตเดฟเดฑเตเดฑเต เดเดจเตเดจ เดตเดฟเดฒเตเดฒเดเต เดเดซเตเดธเตผ เดฎเตเตปเดชเดพเดเต เดเดจเตเดจ เดตเดฟเดฒเตเดฒเตเดเดฟเตฝ เดเดจเตเดจ เดตเดพเตผเดกเดฟเตฝ เดเดจเตเดจ เดตเตเดเตเดเดฟเตฝ เดคเดพเดฎเดธเดฟเดเตเดเตเดจเตเดจ เดเดจเตเดจเดฏเดพเดณเตเดเต เดฎเดเตป เดเดฏ เดเดพเตป เดฌเตเดงเดฟเดชเตเดชเดฟเดเตเดเตเดจเตเดจ เดธเดคเตเดฏเดตเดพเดเตเดฎเตเดฒเด เดเดพเตป เดฎเตเตฝเดเดพเดฃเตเดจเตเดจ เด เดกเตเดฐเดธเดฟเตฝ เดเดคเตเดฐ ...
1 171 3524 -
Subhash Chandran
Retired Dy Tahsildar and Land Consultant, Mobile- 8848753166 . Answered on September 07,2023เดธเตเดฅเดฟเดฐเดชเตเดเตเด เดเดจเตเดจเดพเตฝ เดเดจเตเดคเดพเดฃเต?
Settlement เดเดพเดฒเดคเตเดคเต เดฎเดฒเดฌเดพเตผ เดชเตเดฐเดฆเตเดถเดคเตเดคเตเดณเตเดณ เดญเตเดฎเดฟเดเดณเต เดจเดเตเด, เดคเตเดชเต, เดธเตเดฅเดฟเดฐเด เดชเตเดเตเด,เด เดธเตเดฅเดฟเดฐเดค เดชเตเดเตเด, เดจเดฟเดเตเดคเดฟเดเตเดเตเดเดพเดคเดคเต, เดชเตเดฑเดฎเตเดชเตเดเตเดเต เดเดจเตเดจเดฟเดเตเดเดจเต เดเดฑเดพเดฏเดฟ เดคเดฟเดฐเดฟเดเตเดเดฟเดฐเตเดจเตเดจเต…เดธเตเดฅเดฟเดฐเดชเตเดเตเด เดเดจเตเดจเดพเตฝ เดเดฒเตเดฒเดพ เดตเตผเดทเดตเตเด เดธเตเดฅเดฟเดฐเดฎเดพเดฏเดฟ ...
1 0 2483 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 14,2023Where are the AI Camera locations of motor vehicle department in Kerala?
*All Kerala MVD AI camera locations* Thiruvananthapuram Parassala Thiruvananthapuram Pambukala Thiruvananthapuram Kovalam Jn Thiruvananthapuram Neyyattinkara_2 Thiruvananthapuram Neyyattinkara_1 Thiruvananthapuram Thozhukkal Thiruvananthapuram Balaramapuram_1 Thiruvananthapuram Balaramapuram_2 Thiruvananthapuram Pallichal Jn Thiruvananthapuram Thiruvallom Thiruvananthapuram Kumarichantha Thiruvananthapuram ...
1 0 79205 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on July 07,2020เดญเตเดฎเดฟเดฏเตเดเต เดเดฐเด / เดจเดฟเดเตเดคเดฟ เดเตบเดฒเตเดจเดพเดฏเดฟ เดเดเตเดเดจเต เด เดเดฏเตเดเตเดเดพเด?
เดเตเดฐเดณเดคเตเดคเดฟเตฝ เดญเตเดฎเดฟเดฏเตเดเต เดเดฐเด เดเตบเดฒเตเดจเดพเดฏเดฟ เด เดเดฏเตเดเตเดเตเดจเตเดจเดคเดฟเดจเต, เดคเดฃเตเดเดชเตเดชเตผ เดเดตเดถเตเดฏเดฎเดพเดฃเต. เดเดฎเตเดชเตเดฏเตเดเตเดเตผ เดเดจเดฑเตเดฑเตเดฑเตเดเตเดฏเตเดค เดจเดฎเตเดชเดฑเดพเดฃเต เดคเดฃเตเดเดชเตเดชเตผ. เดคเดฃเตเดเดชเตเดชเตผ เดฒเดญเดฟเดเตเดเดพเตป, เดเดจเดฟเดชเตเดชเดฑเดฏเตเดจเตเดจ เดฐเตเดเดเดณเตเดฎเดพเดฏเดฟ เดตเดฟเดฒเตเดฒเดเต เดเดซเตเดธเต เดธเดจเตเดฆเตผเดถเดฟเดเตเดเตเด. เดญเตเดฎเดฟเดฏเตเดฎเดพเดฏเดฟ เดฌเดจเตเดงเดชเตเดชเตเดเตเด เดฐเตเดเดเตพ เดเดดเดฟเดเตเด เดตเตผเดทเดคเตเดคเต ...
1 0 21579 -
Citizen Helpdesk
Curated Answers from Government Sources . Answered on July 09,2021What are the procedures for starting a resort business in Kerala?
Hospitality Sector: The number licences/approvals/permissions required, and the associated time taken and cost, to start an operate a hotel ...
1 0 5862 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on March 07,2023How can I convert nilam to purayidom in Kerala?
Nilam - purayidom Land conversion or Tharam mattom in Kerala The register containing details of all types of land ( ...
1 325 6889 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 14,2023เดเดจเตเดคเดพเดฃเต เดตเดฟเดฒเตเดฒเตเดเต เดเดซเตเดธเดฟเดฒเต BTR เด เดฅเดตเดพ เดฌเตเดธเดฟเดเต เดเดพเดเตเดธเต เดฐเดเดฟเดธเตเดฑเตเดฑเตผ . เดชเตเดฐเดพเดงเดพเดจเตเดฏเดฎเตเดจเตเดคเต?
เดเดฐเต เดตเดฟเดฒเตเดฒเตเดเดฟเดฒเตเดณเตเดณ เดเดฒเตเดฒเดพ เดญเตเดฎเดฟเดเดณเตเดเตเดฏเตเด เดธเตผเดเตเดเดพเตผ เดญเตเดฎเดฟเดฏเดพเดฏเดพเดฒเตเด เดชเตเดฑเดฎเตเดชเตเดเตเดเต เดญเตเดฎเดฟ เดเดฏเดพเดฒเตเด เดธเตผเดตเตเดตเต เดจเดฎเตเดชเตผ เดเตเดฐเดฎเดคเตเดคเดฟเดฒเตเดณเตเดณ เดตเดฟเดตเดฐเดเตเดเตพ เดเดพเดฃเดฟเดเตเดเตเดจเตเดจ เดธเตเดฅเดฟเดฐเด เดฐเดเดฟเดธเตเดฑเตเดฑเตผ เดเดฃเต เด เดเดฟเดธเตเดฅเดพเดจ เดญเตเดฎเดฟ ...
1 249 4976 -
Venu Mohan
Citizen Volunteer, Kerala . Answered on January 01,2022Which are the medisep hospitals in Kozhikode ?
Following are the list of MEDISEP hospitals in Kozhikode. Hospital Name Specialization EMS Memorial Co- operative Hospital &Research centre - 2708D General Medicine, ...
1 320 9139 -
Ravi
Answered on March 31,2020What are the security documents required for getting KSFE chitty amount?
Any one of theses can be used as Security.Original property deed, Gold, Surrender value of LIC policy, Salary Certificate ...
1 255 5070