Home |Soura subsidy scheme |
I have applied for 3kw under Model II. As per the list of cost available on the website the total cost is shown as Rs75596/-. Below the table Model II, there is another table showing the cost per kw . In that table, the cost per kw for 3 kw plant is Rs.41998/-. after deduction of 40% the cost will be Rs.94500/- Why this difference? Any mistake? If so please make the required correction in the list of cost.
I have applied for 3kw under Model II. As per the list of cost available on the website the total cost is shown as Rs75596/-. Below the table Model II, there is another table showing the cost per kw . In that table, the cost per kw for 3 kw plant is Rs.41998/-. after deduction of 40% the cost will be Rs.94500/- Why this difference? Any mistake? If so please make the required correction in the list of cost.

Answered on December 28,2020
For 3kW in model 2, consumer has to pay Rs75596/-. No other charges
Related Questions
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020If my house needs to be renovated, will KSEB replace the Soura solar panel free of cost?
You have to pay the labour charge for replacing the Soura solar panel.
1
12
183
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Suppose I have set up a plant with a 40% subsidy scheme with 3 kWp capacity as part of the KSEB Soura scheme. If I have excess electricity after my consumption, can this be adjusted against my bill via net metering?
In model 2, every year amount will be adjusted on September 30. If there is an export of electricity, ...
1
76
1488
-
KSFE
Sponsoredเดเต.เดเดธเต.เดเดซเต.เด เดญเดตเดจ เดตเดพเดฏเตเดช
30 เดตเตผเดทเด เดตเดฐเตเดฏเตเดณเตเดณ เดคเดฟเดฐเดฟเดเตเดเดเดตเต เดเดพเดฒเดพเดตเดงเดฟเดฏเดฟเดฒเตโ.. เดฒเดณเดฟเดคเดฎเดพเดฏ เดจเดเดชเดเดฟเดเตเดฐเดฎเดเตเดเดณเดฟเดฒเตเดเต เดจเตเดเดพเด 1 เดเตเดเดฟ เดฐเตเดช เดตเดฐเต เดตเดพเดฏเตเดช...T&C Apply
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020What will be the cost of Solar power plant with 3 kW capacity, if applied on a 40% scheme as part of the KSEB Soura scheme?
It will cost you Rs 1,62,000. If you opt for Model 2, you get 40% of it as the subsidy.So you need to pay ...
1
85
1340
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020How much will be the cost for 2 kWp installation for KSEB Soura scheme?
As per the Ministry of New and Renewable Energy (MNRE) issued guidelines, the maximum amount the empanelled service providers ...
1
29
582
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020I have 1000 sqft rooftop. How many kw of solar panel can I install as part of KSEB Soura scheme?
1 kw requires 100 sqft. So you can install 10kw of solar panel on 1000 sqft rooftop. With 10 ...
1
55
1040
-
KSFE
Sponsoredเดเต.เดเดธเต.เดเดซเต.เด เดกเดฏเดฎเดฃเตเดเต เดเดฟเดเตเดเดฟเดเตพ 2023
เดเดฟเดเตเดเดฟเดฏเตโเดเตเดเตเดชเตเดชเด เดธเดฎเตเดฎเดพเดจเดชเตเดชเตเดฐเตเดฎเดด!..เดธเตเดชเตเดฑเตเดฑเดเดฌเตผ 30 เดตเดฐเต...T&C Apply
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020For 3KW plant, how much is the cost in KSEB Soura scheme?
As per the Ministry of New and Renewable Energy (MNRE) issued guidelines, the maximum amount the empanelled service providers ...
1
38
704
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020I have applied for the KSEB Soura scheme Phase 1 earlier. Officers from KSEB inspected my rooftop.I have not got any reply from them since then. What to do?
Call 1912 with your consumer number and inform them about your issue.
1
22
380
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 08,2020Is it possible for the customer to select the unit and company for solar panel installation in model 2 of the KSEB Soura scheme?
Customers can choose the company for solar panel installation in model 2 of the KSEB Soura scheme.
1
10
105
-
-
Kerala State Electricity Board
Government of Kerala . Answered on March 17,2020I have applied for KSEB soura scheme. What are the next steps?
Survey and implementation of Soura Subsidy scheme will start immediately after completing regitration process. The installation of panels will ...
1
8
147
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 22,2020Can we install a solar power plant on the sloping roof as part of KSEB Soura scheme?
Yes, you can install it on a sloping roof as well.
1
11
186
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 22,2020How much area wanted for 3 kW solar plant as part of the KSEB Soura scheme?
300 sqft is required for a 3 kW Solar plant.
1
5
49
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 22,2020Is it true that once the KSEB soura plant was installed, the homeowner would not be allowed to do anything (like painting) for 25 years?
There are no restrictions as such for the house owner.
1
6
74
-
KDISC
Sponsoredเดเตเดฐเดณเดคเตเดคเดฟเดจเต เดเดคเต เด เดญเดฟเดฎเดพเดจเดจเตเดเตเดเด
Skoch เด เดตเดพเตผเดกเต เดเดฑเตเดฑเตเดตเดพเดเตเดเดฟ เดเตเดฐเดณ เดกเตเดตเดฒเดชเตเดฎเตเดจเตเดฑเต เดเดจเตเดฑเต เดเดจเตเดจเดตเตเดทเตป เดธเตเดเตเดฐเดพเดฑเตเดฑเดเดฟเดเตเดเต เดเตเตบเดธเดฟเตฝ (K-DISC)
-
Try to help us answer..
-
I have installed KSEB solar power plant in my house. Suppose the plant made 400 units and I have used 500 units a month. So should I pay the electricity bill for 100 units or will it be adjusted from the previous month's excess unit reserve?
Write Answer
-
How much time it would take in Kerala for getting metre changed by KSEB for on grid Solar connection after submitting papers after installation?
Write Answer
-
Kerala State Electricity Board-Soura (Solar project)-Subsidy scheme 1C with an agreement that excess unit produced from the rooftop would be taken by KSEB through on-grid system and will be paid back. But more than an year passed no payment received. What to do?
Write Answer
-
Can one convert an KSEB Soura on-grid system to offgrid at a later date?
Write Answer
-
Who are the empanelled list of solar panel providers in the KSEB soura scheme?
Write Answer
-
KDISC
Sponsoredเดเตเดฐเดณเดคเตเดคเดฟเดจเต เดเดคเต เด เดญเดฟเดฎเดพเดจเดจเตเดเตเดเด
Skoch เด เดตเดพเตผเดกเต เดเดฑเตเดฑเตเดตเดพเดเตเดเดฟ เดเตเดฐเดณ เดกเตเดตเดฒเดชเตเดฎเตเดจเตเดฑเต เดเดจเตเดฑเต เดเดจเตเดจเดตเตเดทเตป เดธเตเดเตเดฐเดพเดฑเตเดฑเดเดฟเดเตเดเต เดเตเตบเดธเดฟเตฝ (K-DISC)
-
I have installed KSEB solar power plant in my house. Suppose the plant made 400 units and I have used 500 units a month. So should I pay the electricity bill for 100 units or will it be adjusted from the previous month's excess unit reserve?
Trending Questions
-
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 14,2023Where are the AI Camera locations of motor vehicle department in Kerala?
*All Kerala MVD AI camera locations* Thiruvananthapuram Parassala Thiruvananthapuram Pambukala Thiruvananthapuram Kovalam Jn Thiruvananthapuram Neyyattinkara_2 Thiruvananthapuram Neyyattinkara_1 Thiruvananthapuram Thozhukkal Thiruvananthapuram Balaramapuram_1 Thiruvananthapuram Balaramapuram_2 Thiruvananthapuram Pallichal Jn Thiruvananthapuram Thiruvallom Thiruvananthapuram Kumarichantha Thiruvananthapuram ...
1
0
17206
-
JOY MRC
Answered on September 19,2021How to convert license number 5/9308/2014 from Kerala to this new format in Digilocker?
Use mparivahan app for RC and License addition which is equivalent to digilocker and also valid for Rto checking. ...
2
1869
39949
-
KDISC
SponsoredKKEM Skills Program
เดเตปเดกเดธเตเดเตเดฐเดฟเดเตเดเต เดเดตเดถเตเดฏเดฎเดพเดฏ เดจเตเดชเตเดฃเตเดฏเด เดเดฑเดชเตเดชเดพเดเตเดเดฟ เดเดจเตเดฑเตผเดตเตเดฏเตเดตเดฟเตฝ เดชเดเตเดเตเดเตเดเตเดเดพเตป เดชเตเดฐเดพเดชเตเดคเดฎเดพเดเตเดเตเดเดฏเดพเดฃเต เดจเตเดณเดเต เดฎเดฟเดทเดจเตเดฑเต DWMS เดชเตเดฒเดพเดฑเตเดฑเตเดซเตเด. เดเดจเตเดจเต เดคเดจเตเดจเต เดฐเดเดฟเดธเตเดฑเตเดฑเตผ เดเตเดฏเตเดฏเต.
-
Team Digilocker
Ministry of Electronics & IT (MeitY) . Answered on August 21,2020How to download Kerala SSLC mark card from Digilocker?
We are into discussion with the department. They will soon be available.
2
94
7576
-
Consumer Complaints & Protection
Regd. Organization for Consumer Rights . Answered on June 25,2021NPS,NPNS, NPI, PHH,AAY เดเดจเตเดคเดพเดฃเต?
NPS - Non Priority Subsidy,NPNS - Non Priority Non Subsidy,NPI - Non Priority Institution,PHH - Priority House Hold,AAY - ...
2
0
11158
-
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on July 07,2020เดญเตเดฎเดฟเดฏเตเดเต เดเดฐเด / เดจเดฟเดเตเดคเดฟ เดเตบเดฒเตเดจเดพเดฏเดฟ เดเดเตเดเดจเต เด เดเดฏเตเดเตเดเดพเด?
เดเตเดฐเดณเดคเตเดคเดฟเตฝ เดญเตเดฎเดฟเดฏเตเดเต เดเดฐเด เดเตบเดฒเตเดจเดพเดฏเดฟ เด เดเดฏเตเดเตเดเตเดจเตเดจเดคเดฟเดจเต, เดคเดฃเตเดเดชเตเดชเตผ เดเดตเดถเตเดฏเดฎเดพเดฃเต. เดเดฎเตเดชเตเดฏเตเดเตเดเตผ เดเดจเดฑเตเดฑเตเดฑเตเดเตเดฏเตเดค เดจเดฎเตเดชเดฑเดพเดฃเต เดคเดฃเตเดเดชเตเดชเตผ. เดคเดฃเตเดเดชเตเดชเตผ เดฒเดญเดฟเดเตเดเดพเตป, เดเดจเดฟเดชเตเดชเดฑเดฏเตเดจเตเดจ เดฐเตเดเดเดณเตเดฎเดพเดฏเดฟ เดตเดฟเดฒเตเดฒเดเต เดเดซเตเดธเต เดธเดจเตเดฆเตผเดถเดฟเดเตเดเตเด. เดญเตเดฎเดฟเดฏเตเดฎเดพเดฏเดฟ เดฌเดจเตเดงเดชเตเดชเตเดเตเด เดฐเตเดเดเตพ เดเดดเดฟเดเตเด เดตเตผเดทเดคเตเดคเต ...
1
0
15991
-
KDISC
Sponsoredเดจเดพเดเดฑเดฟเดฏเดเตเดเต เดจเดพเดเดฟเดจเดพเดฏเตเดณเตเดณ เดจเดฟเดเตเดเดณเตเดเต เดเดถเดฏเดเตเดเตพ
Join the Innovation revolution
-
Citizen Helpdesk
Curated Answers from Government Sources . Answered on November 27,2021Which hospitals in Kerala accept Medisep Insurance?
Hospital empanelment is not yet completed Source: This answer is provided by Finance (Health Insurance) Department, Kerala
2
107
28646
-
Niyas Maskan
Village Officer, Kerala . Answered on January 26,2021How to get the affidavit for caste certificate in Kerala ?
เดเดฐเต เดตเตเดณเตเดณ เดชเตเดชเตเดชเดฑเดฟเตฝ เดฎเตเดเดณเดฟเตฝ เด เดซเดฟเดกเดตเดฟเดฑเตเดฑเต เดเดจเตเดจเต เดฐเตเดเดชเตเดชเตเดเตเดคเตเดคเตเด เด เดคเดฟเดจเต เดคเดพเดดเต เดเตผเดเตเดเดพเดฃเต เด เดคเต เดธเดฎเตผเดชเดฟเดเตเดจเดคเต เด เดคเต เดฐเตเดเดชเตเดชเตเดเตเดคเตเดคเตเด. เด เดคเดฟเดจเต เดถเตเดทเด เดเดฐเดพเดฃเต เดธเดฎเตผเดชเดฟเดเตเดจเดคเต เด เดตเดฐเตเดเต เดตเดฟเดตเดฐเด เดจเตฝเดเตเด. เด เดคเดฟเดจเต ...
1
87
13707
-
Venu Mohan
Citizen Volunteer, Kerala . Answered on July 24,2021เดเตเดฐเดณเดคเตเดคเดฟเตฝ เดจเตเตบ เดเตเดฐเตเดฎเดฟ เดฒเดฏเตผ เดธเตผเดเตเดเดฟเดซเดฟเดเตเดเดฑเตเดฑเต เดเดฟเดเดพเดจเตเดณเตเดณ เดฎเดพเดจเดฆเดฃเตเดกเด เดเดจเตเดคเดพเดฃเต?
เดจเตเตบ เดเตเดฐเตเดฎเดฟเดฒเตเดฏเดฑเดฟเดจเต เดเตเดฑเดฟเดเตเดเตเดณเตเดณ เดชเตเตผเดฃ เดตเดฟเดตเดฐเดเตเดเตพ 2020เดฒเต เดฑเดตเดจเตเดฏเต เดเตเดกเดฟเตฝ เดจเดฟเดจเตเดจเต เดคเดพเดดเต เดเตเดเตเดคเตเดคเดฟเดเตเดเตเดฃเตเดเต. เด เดคเต เดจเตเดเตเดเดฟ เดฎเดจเดธเดฟเดฒเดพเดเดพเด เดคเดพเดเตเดเตพ เดเดคเดฟเดจเต เด เตผเดนเดจเดพเดฃเต เด เดฒเตเดฒเดฏเต เดเดจเตเดจเต. เดจเตเดฃเตเดเตเดฐเตเดฎเดฟเดฒเตเดฏเดฐเต ...
1
128
5883
-
KDISC
Sponsoredเดจเดพเดเดฑเดฟเดฏเดเตเดเต เดจเดพเดเดฟเดจเดพเดฏเตเดณเตเดณ เดจเดฟเดเตเดเดณเตเดเต เดเดถเดฏเดเตเดเตพ
Join the Innovation revolution
-
Consumer Complaints & Protection
Regd. Organization for Consumer Rights . Answered on October 16,2020เดเดจเตเดคเดพเดฃเต เดเตฝ เดเตเดตเตป เดฎเดฟเดทเตป เดชเดฆเตเดงเดคเดฟ ?
เดเตเดจเตเดฆเตเดฐ-เดธเดเดธเตเดฅเดพเดจ เดธเตผเดเตเดเดพเดฐเตเดเดณเตเดเต 90 % เดธเดฌเตเดธเดฟเดกเดฟเดฏเตเดเตเดเตเดเดฟ เดเตเดฐเดณเดคเตเดคเดฟเดฒเต เดเตเดฐเดพเดฎ เดชเดเตเดเดพเดฏเดคเตเดคเต เดชเดฐเดฟเดงเดฟเดเดณเดฟเดฒเต เดฎเตเดดเตเดตเตป เดเตเดเตเดเดฌเดเตเดเตพเดเตเดเตเด เดชเตเดคเดฟเดฏ เดตเดพเดเตเดเตผ เดเดฃเดเตเดทเตป เดจเตฝเดเตเดจเตเดจเดคเดฟเดจเตเดณเตเดณ เดเตฝเดเตเดตเตป เดฎเดฟเดทเตป เดชเดฆเตเดงเดคเดฟ เดเตเดฐเดณเดคเตเดคเดฟเดฒเต ...
1
501
13388
-
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on March 07,2023What is the procedure for tharam matom - land conversion nilam to purayidom in Kerala ?
Nilam - purayidom Land conversion or Tharam mattom in Kerala The register containing details of all types of land ( ...
1
0
736
-
KDISC
Sponsored20 เดฒเดเตเดทเด เดชเตเตผเดเตเดเต เดคเตเดดเดฟเตฝ
เดจเดฟเดเตเดเดณเตเดเต เดฏเตเดเตเดฏเดคเดฏเตเดเตเดเดจเตเดธเดฐเดฟเดเตเดเตเดณเตเดณ เดเตเดฒเดฟเดฏเตเดเตเดเดพเดฏเดฟ เดเดจเตเดจเต เดคเดจเตเดจเต เดฐเดเดฟเดธเตเดฑเตเดฑเตผ เดเตเดฏเตเดฏเต.
- I have installed KSEB solar power plant in my house. Suppose the plant made 400 units and I have used 500 units a month. So should I pay the electricity bill for 100 units or will it be adjusted from the previous month's excess unit reserve? Write Answer
- How much time it would take in Kerala for getting metre changed by KSEB for on grid Solar connection after submitting papers after installation? Write Answer
- Kerala State Electricity Board-Soura (Solar project)-Subsidy scheme 1C with an agreement that excess unit produced from the rooftop would be taken by KSEB through on-grid system and will be paid back. But more than an year passed no payment received. What to do? Write Answer
- Can one convert an KSEB Soura on-grid system to offgrid at a later date? Write Answer
- Who are the empanelled list of solar panel providers in the KSEB soura scheme? Write Answer
Top contributors this week

Kerala Development and Innovation Strategic Council (KDISC)

Government of Kerala

Tahsildar, Kurnool District, AP / Govind Singh R


A R Ashraf
Expert in Revenue and Travel documentation. 17+ years experience in emigration and embassy related documentation.

Niyas Maskan

Village Officer, Kerala

Digital Doc Solution
Helping with queries related to Documentation & Technical computer issues.
Best Practices while applying for Government services online
1. Check whether you are eligible to apply for this service.
2. Check the documents required for application before applying.
3. Keep the documents in one folder for ease of access.
4. In case of any doubts, check whether the queries are already answered. You can check the FAQ section of the department website or use platforms like Tesz for this purpose.
5. Once you have applied, note down the application number to track the status.
6. Check the time required for the completion of the service. If the service is not completed within the due time, track the status online or reach out to the department.