What is the tariff, rate per unit (KWH) that KSEB will pay me for excess electricity produced and given to grid?
What is the tariff, rate per unit (KWH) that KSEB will pay me for excess electricity produced and given to grid?
Related Questions
-
Kerala State Electricity Board
Government of Kerala . Answered on January 19,2021As I have selected the developer for Soura Subsidy Scheme in December, what is the next step of installation and when and how the same shall be initiated? KSEB or the developer will contact me ?
Please confirm whether you are shortlisted by calling 1912. If you are shortlisted, there will be site inspection during ...
1 0 420 -
Kerala State Electricity Board
Government of Kerala . Answered on March 19,2021I have registered for Soura Subsidy Project Model 2 by paying the application fee in the month of Dec 2020. I have selected the developer also. Unfortunately, nobody has responded yet. What should I do ?
Sir, you are not shortlisted for this phase. Please wait for next phase of developer selection, which is expected ...
1 0 92 -
Kerala State Electricity Board
Government of Kerala . Answered on March 19,2021I would like to go for KSEB's Saura scheme Model II. My average monthly consumption is 250-275 units. 1) What capacity plant I should select? 2) Is the scheme with 40% subsidy still available? 3) What is the expected maintenance cost of plant, say 4kwp capacity plant, from 6th year onwards?
1) What capacity plant I should select? Model 2, 3kW 2) Is the scheme with 40% subsidy still available? Yes 3) ...
1 0 312 -
Kerala State Electricity Board
Government of Kerala . Answered on April 07,2021I have registered for KSEB's Soura scheme Model II, I have paid for the existing meter, 1) will it be replaced by net-meter - how much have to pay if not renting 2) how is fixed charge calculated for soura consumers (e.g if consumption is less than export) 3)is there facility in inverter that can alert kseb office in cases of low energy production
1. Existing meter will be replaced with Net meter2. Fixed charge is based on net import. Tariff fixed by ...
2 0 639 -
Kerala State Electricity Board
Government of Kerala . Answered on July 07,2021What about terms and conditions for a hybrid inverter for KSEB soura type 3 model? As it works as on-grid and provides backup, any subsidy is available for same?
เดเต เดเดธเต เด เดฌเดฟเดฏเตเดเต เดชเตเดฐเดชเตเดชเตเดฑ เดธเตเดฐเตเตผเดเตเด เดชเดฆเตเดงเดคเดฟเดฏเดพเดฏ 'เดธเตเดฐ' เดธเดเดฌเดจเตเดงเดฟเดเตเด เดตเดฟเดตเดฐเดเตเดเตพ เดเดฐเดพเดฏเดพเดจเตเด เดธเดเดถเดฏเดเตเดเตพ เดฆเตเดฐเตเดเดฐเดฟเดเตเดเดพเดจเตเด เดชเตเดฐเดตเตเดคเตเดคเดฟ เดฆเดฟเดตเดธเดเตเดเดณเดฟเตฝ เดฐเดพเดตเดฟเดฒเต 10 เดจเตเด เดตเตเดเตเดเตเดเต ...
1 0 616 -
Kerala State Electricity Board
Government of Kerala . Answered on October 04,2021I have Phase 1 Model 1 Soura Solar Panels installed at my home where KSEB pays for 10% of the electricity generated without any investment fromy end. Can i convert it to Phase 2 Model 2 of the new Soura Scheme by paying 75000 which the cost of 3K Model 2 Plant ?
You may please visit ekiran.kseb.in for more details
1 0 81 -
Kerala State Electricity Board
Government of Kerala . Answered on October 12,2021Under Soura Subsidy scheme, Is it possible to install Mono perc panels, if I am ready to meet the additional expenses for for the same?. My aim is to generate more electricity from the limited space available.
เดธเตเดฐ เดชเตเดฐเตเดเดเตเดเดฟเดจเตเดฑเต เดญเดพเดเดฎเดพเดฏเดฟ เดฎเตเดฃเต เดชเตเตผเดเต เดเดจเตเดจเต เดชเตเดณเดฟ เดเตเดฐเดฟเดธเตเดฑเตเดฑเดฒเตเตป เดเดจเตเดจเต เด เดฒเตเดฒเตเดเตเดเดฟเตฝ เดฎเตเดฃเต เดเตเดฐเดฟเดธเตเดฑเตเดฑเดฒเตเตป เดเดจเตเดจเต เดชเดฑเดฏเตเดจเตเดจ เดฐเตเดคเดฟเดฏเดฟเตฝ เดเดณเตเดณ เดธเตเดชเตเดธเดฟเดซเดฟเดเตเดเตเดทเตป KSEB เดเตเดเตเดคเตเดคเดฟเดเตเดเดฟเดฒเตเดฒ ...
1 0 299 -
Hrishikesh H K
Answered on September 02,2022I have registered for KSEB's Soura scheme Model II, I have paid for the existing meter, 1) will it be replaced by net-meter - how much have to pay if not renting 2) how is fixed charge calculated for soura consumers (e.g if consumption is less than export) 3)is there facility in inverter that can alert kseb office in cases of low energy production
I also feel the same. Even in single phase connection, voltage frequently goes below 180v. Will suggest KSEB to ...
2 0 355 -
Hrishikesh H K
Answered on September 02,2022I have registered for KSEB's Soura scheme Model II, I have paid for the existing meter, 1) will it be replaced by net-meter - how much have to pay if not renting 2) how is fixed charge calculated for soura consumers (e.g if consumption is less than export) 3)is there facility in inverter that can alert kseb office in cases of low energy production
I also feel the same. Even in single phase connection, voltage frequently goes below 180v. Will suggest KSEB to ...
2 0 355 -
Kerala State Electricity Board
Government of Kerala . Answered on November 08,2021If i install a solar plant on my roof top privately will i be eligible for any government subsidies?
No
1 0 118 -
Kerala State Electricity Board
Government of Kerala . Answered on November 08,2021If I have an offgrid solar power plant installed in my home, can i apply for the kseb's sourya subsidy on-grid scheme?
No
1 0 169 -
Kerala State Electricity Board
Government of Kerala . Answered on November 08,2021Is there any off-grid solar subsidy scheme where the customer can make use of battery to store the generated power?
No
1 0 39