What are the costs fixed by KSEB for supply, installation and commissioning of 3 KW, 4 KW and 5 KW solar plants as of May-2023? What are the subsidy amounts for KSEB Saura scheme as of now?
What are the costs fixed by KSEB for supply, installation and commissioning of 3 KW, 4 KW and 5 KW solar plants as of May-2023? What are the subsidy amounts for KSEB Saura scheme as of now?
Related Questions
-
Kerala State Electricity Board
Government of Kerala . Answered on March 19,2021I would like to go for KSEB's Saura scheme Model II. My average monthly consumption is 250-275 units. 1) What capacity plant I should select? 2) Is the scheme with 40% subsidy still available? 3) What is the expected maintenance cost of plant, say 4kwp capacity plant, from 6th year onwards?
1) What capacity plant I should select? Model 2, 3kW 2) Is the scheme with 40% subsidy still available? Yes 3) ...
1 0 312 -
Kerala State Electricity Board
Government of Kerala . Answered on April 07,2021I have registered for KSEB's Soura scheme Model II, I have paid for the existing meter, 1) will it be replaced by net-meter - how much have to pay if not renting 2) how is fixed charge calculated for soura consumers (e.g if consumption is less than export) 3)is there facility in inverter that can alert kseb office in cases of low energy production
1. Existing meter will be replaced with Net meter2. Fixed charge is based on net import. Tariff fixed by ...
2 0 639 -
Kerala State Electricity Board
Government of Kerala . Answered on May 24,2021I have done the saura model 3 registration on 26th jan 2021 1. When wiill be the next developer selection scheduled ? 2. I am from palakkad, will the developer selection will be specific to a region or will be common for all region? 3. Approx time required for installation completion from date of developer selection? 4. I read from news paper new tenders called for this, is this process completed and does it have any impact on next developer selection schedule?
1. Next phase of developer selection is getting delayed due to covid restrictions. It is expected during June-2021 2. Common ...
1 0 88 -
Kerala State Electricity Board
Government of Kerala . Answered on July 07,2021What about terms and conditions for a hybrid inverter for KSEB soura type 3 model? As it works as on-grid and provides backup, any subsidy is available for same?
เดเต เดเดธเต เด เดฌเดฟเดฏเตเดเต เดชเตเดฐเดชเตเดชเตเดฑ เดธเตเดฐเตเตผเดเตเด เดชเดฆเตเดงเดคเดฟเดฏเดพเดฏ 'เดธเตเดฐ' เดธเดเดฌเดจเตเดงเดฟเดเตเด เดตเดฟเดตเดฐเดเตเดเตพ เดเดฐเดพเดฏเดพเดจเตเด เดธเดเดถเดฏเดเตเดเตพ เดฆเตเดฐเตเดเดฐเดฟเดเตเดเดพเดจเตเด เดชเตเดฐเดตเตเดคเตเดคเดฟ เดฆเดฟเดตเดธเดเตเดเดณเดฟเตฝ เดฐเดพเดตเดฟเดฒเต 10 เดจเตเด เดตเตเดเตเดเตเดเต ...
1 0 616 -
Kerala State Electricity Board
Government of Kerala . Answered on July 28,2021I have registered under the KSEB soura scheme II. How do I know whether I have been selected. I had also paid the registration charges. That has been now adjusted in my monthly power bill. There is no communication regarding the solar registration so far.
https://ekiran.kseb.in/ เดเดจเตเดจ เดตเตเดฌเตเดธเตเดฑเตเดฑเต เดตเดดเดฟเดฏเต 9496018370, 9496266631 เดเดจเตเดจเต เดจเดฎเตเดชเดฐเตเดเดณเดฟเดฒเต เด เดจเตเดตเตเดทเดฟเดเตเดเดฑเดฟเดฏเดพเตป เดเดดเดฟเดฏเตเด
1 0 2860 -
Kerala State Electricity Board
Government of Kerala . Answered on August 11,2021May I know what is the present status of kseb soura scheme installation based on my KSEB consumer number or soura register number?
You can have the details from KSEB Ekiran Also you may please call : 94962 66631 / 94960 18370
1 0 143 -
Kerala State Electricity Board
Government of Kerala . Answered on October 04,2021I have Phase 1 Model 1 Soura Solar Panels installed at my home where KSEB pays for 10% of the electricity generated without any investment fromy end. Can i convert it to Phase 2 Model 2 of the new Soura Scheme by paying 75000 which the cost of 3K Model 2 Plant ?
You may please visit ekiran.kseb.in for more details
1 0 81 -
Kerala State Electricity Board
Government of Kerala . Answered on August 11,2021I applied for KSEB Soura project 4 kv Model 2. Can solar panels be installed on top of roof tiles or not? Can I change from Model II 4kv to Model I 2 kv?
Yes. you might have to bear the cost of framework for the installation.You may please contact Soura team for ...
1 0 185 -
Kerala State Electricity Board
Government of Kerala . Answered on October 04,2021I have space to put up about 65kWp of solar panel. How much subsidy is allowed by KSEB?
You may please visit ekiran.kseb.in for more details
1 0 34 -
Kerala State Electricity Board
Government of Kerala . Answered on November 08,2021Is there any off-grid solar subsidy scheme where the customer can make use of battery to store the generated power?
No
1 0 39 -
Kerala State Electricity Board
Government of Kerala . Answered on November 08,2021If I have an offgrid solar power plant installed in my home, can i apply for the kseb's sourya subsidy on-grid scheme?
No
1 0 169 -
Hrishikesh H K
Answered on September 02,2022I have registered for KSEB's Soura scheme Model II, I have paid for the existing meter, 1) will it be replaced by net-meter - how much have to pay if not renting 2) how is fixed charge calculated for soura consumers (e.g if consumption is less than export) 3)is there facility in inverter that can alert kseb office in cases of low energy production
I also feel the same. Even in single phase connection, voltage frequently goes below 180v. Will suggest KSEB to ...
2 0 355 -
Hrishikesh H K
Answered on September 02,2022I have registered for KSEB's Soura scheme Model II, I have paid for the existing meter, 1) will it be replaced by net-meter - how much have to pay if not renting 2) how is fixed charge calculated for soura consumers (e.g if consumption is less than export) 3)is there facility in inverter that can alert kseb office in cases of low energy production
I also feel the same. Even in single phase connection, voltage frequently goes below 180v. Will suggest KSEB to ...