How to get CMC Connections from Water Supply and Sewerage Board in Bangalore?






Name of the Department BANGALORE WATER SUPPLY AND SEWERAGE BOARD
Name of the Service Permission for new connection/Additional Connection for water supply and under Ground Drainage for residential buildings excluding Apartments
Name of the Sub Service CMC Connections
Whom to approach for this service (Designated Officer)? ASSISTANT EXECUTIVE ENGINEER
Procedure involved to get this service The application shall be filled in online along with photos of applicant along with sanction plan Road cutting endorsement issued by BBMP/BDA upto date tax paid receipt occupancy certificate for multi storied buildings, khata certificate, photographs of building, owner, and rain water harvesting system, receipt of GBWASP payment to be uploaded. Then Assistant Engineer or Water Inspector will inspect and recommend the file. AEE will sanction the domestic house service connections at sub division office. In respect of multi storied buildings which attract prorata charges, the measurement of the building will be taken, recorded and recommended by AE and AEE then the file will be forwarded to office of Executive Engineer Additional Chief Engineer to sanction the file depending on amount of prorata as per delegation of powers. EE ACE will inspect the premises and take action to sanction the file.
Who are eligible to get this service The Owner or Occupier of the building who desires to have water supply or sanitary connection to his premises are eligible to get this service.
Documents to be enclosed with the request

1 . Upto date taxpaid receipts/khata extract

2 . Road cutting endorsement(except the amount paid under GBWASP)

3 . The payment of DD or any document in respect of GBWASP

Fee/Charges to be paid to get the service Depends on connections
Maximum number of days to wait to get this service delivered 7 Working Days
Whom to approach as a appeal (Competent Officer), if the service is not delivered in time or rejected by officer

Additional Chief Engineer

Maximum number of days to wait to get the decision of the Competent Officer 15 Working Days
Whom to approach as 2nd appeal (Appellate Authority), if the decision of the Competent officer is not acceptable or not implemented?

Engineer-In-Chief/Chief Engineer,BWSSB

Maximum no. of days to wait to get the decision of Appellate Authority 30 Working Days
Website (if online)

www.bwssb.gov.in


Work Flow

Step

Description

No. of Days

Designation

1

Filled application received through online for sanction of house service connection along with photos and necessary documents uploaded as per checklist to be verified . Documents to be verified 1.sanctioned plan in triplicate and upto date tax paid receipt or katha certificate. 2.road cutting endorsement 3.payment of dd or any document in respect of gbwasp

1.00

Officer(General)

2

Water inspector to inspect the premises requested for house service connection and recommend the file.

1.00

Officer(General)

3

Assistant engineer to inspect the premises and recommend the file

1.00

Officer(General)

4

Assistant executive engineer for verification and if required inspection and approval to the file.

1.00

Officer(General)

5

Draftsmen to issue the challan to the applicant for payment of necessary deposits

1.00

Officer(General)

6

Assistant executive engineer to sanction the file after the receipt of payment and revenue manager will generate the r r no.

1.00

Officer(General)

7

Final sanction to the file and issue of work order

1.00

Officer(General)

How would you rate the answer?


Excellent Good Neutral Poor Bad

Thank you for your response..


tesz.in
Hey , can you help?
Answer this question

Guide

Karnataka Voter List 2024 - Search By Name, Download

Empowering citizens to exercise their democratic rights is crucial, especially in the vibrant state of Karnataka. This concise guide offers clear steps for downloading the voter list, searc..
  Click here to get a detailed guide